Featured project

Sint-Janskerk Gouda

Gouda

EPS30 + Ceramic Decking

Existing Construction

In cooperation with Van Hoogevest Architecten, Jupiter was able to provide the longest church in the Netherlands, the Sint-Jan church in Gouda, with our dry construction solutions. Jupiter installed here +-300m2 of dry construction floor heating, together with the strongest ceramic screed.

A particular challenge with this project was the desired finishing floor, which was made entirely of copper. A copper floor expands relatively much when heated, so gluing these floors is almost never possible. By using the knowledge of partners and Jupiter together, this copper finishing floor was installed without problems in the nave of St. John's Church, over the Jupiter systems.

 